
Fire alarm control panel
The heart of the system: receives detector signals, locates the event, and triggers alarms and linked suppression.
For buildings under construction, extensions and changes of use: we supply the equipment, run the pipework and cabling, install, program and commission the systems, then hand the facility over ready for inspection by the competent authorities.


The heart of the system: receives detector signals, locates the event, and triggers alarms and linked suppression.

Its glass bulb breaks at a set temperature and sprays water directly onto the fire.

Keeps the suppression network pressurised and feeds it when sprinklers or hoses operate.

Valves that isolate parts of the network and control water flow during maintenance or emergencies.

A ready water hose on a reel inside a cabinet, for manual firefighting before Civil Defense arrives.

Switches on automatically during a power cut to light corridors and escape routes.

Points to the nearest exit and stays lit even when the power fails.
We visit the facility, take measurements, and set requirements based on how the building is used.
A detailed offer with specifications, quantities, prices and timeline, no vague line items.
Equipment supplied and work executed as agreed, with continuous coordination with you.
The system is tested and handed over, then maintained on schedule if you want it.
The Saudi Fire Code SBC 801 and Civil Defense requirements come first, and the code draws on international NFPA standards. The main standards behind this service:
The quote states specifications, quantities and timeline. No catch-all line items, no surprises on the invoice.
We do not hand over a system that would not pass inspection. Readiness for approval is part of the job, not an extra step.
A system needs scheduled maintenance to keep working. We stay with you after handover rather than ending there.
The earlier the better: pipework and cabling go in before finishes, and changing them later is harder and costlier.
Yes. We coordinate with the main contractor and the owner according to the contract arrangement.
A tested system ready for inspection. The handover documents are set out in the offer.
Send us the facility details and we will come back with a quote based on an actual site survey, not a general estimate.